Pile breaker
Because of building need, the piling juts out from the earth for one or two metres. It
is necessary to demolish such overhangs in order to go ahead with the building of constructions. Mantovanibenne Pile Breaker solve the problem by crushing in fast and precise way the foundation piles. They maintain intact the iron rod: this makes easier the
rebuilding work. The building system is based on concatenate modules which allow to approach rounder or squared piles. Thanks to this system it is possible to plus or leave the single elements to obtain the widest range of sizes: starting from a minimum of 350 mm up to 1800 mm for round section and from 350 mm up to 800 mm for square ones.
Mantovanibenne Pile Breaker can be installed on a lot of machines (excavators, cranes,telescopic arm etc.)through the use of special wires supplies directly. Mantovanibennealso supplies different tips depending on dimensions and shapes: this allows to face all job site needs.
| PILE BREAKER |
| RPB-L (Light Series) |
| Excavator weight |
t |
10 - 15 |
10 - 15 |
15 - 20 |
| Weight |
kg |
1000 |
1160 |
1330 |
| Pile diameter |
mm |
350 - 450 |
500 - 600 |
650 - 750 |
| Number of elements |
|
6 |
7 |
8 |
| PILE BREAKER |
| SPB-L (Squared Piles) |
| Excavator weight |
t |
10 - 15 |
10 - 15 |
15 - 20 |
| Weight |
kg |
800 |
1000 |
1100 |
| Pile diameter |
mm |
- |
- |
- |
| Number of elements |
|
4+4 |
4+4 |
4+4 |
| PILE BREAKER |
| RPB-H (Heavy Series) |
| Excavator weight |
t |
20 - 25 |
20 - 25 |
25 - 30 |
25 - 30 |
30 - 35 |
30 - 35 |
| Weight |
kg |
2000 |
2250 |
2500 |
3100 |
3380 |
3665 |
| Pile diameter |
mm |
750-900 |
900-1050 |
1100-1250 |
1250-1400 |
1450-1600 |
1650-1800 |
| Number of elements |
|
8 |
9 |
10 |
11 |
12 |
13 |